Plasterers & Damp Proofing | Atherton & Greater Manchester Call: 07812 075990

Bathrooms in Atherton

Bathroom Fitting & Installation across Atherton (M46), right here in our home town.

Fully tiled shower room with a glass enclosure and chrome towel rail

Bathrooms for Atherton Homes

Bathrooms in Atherton mostly mean small rooms made to work harder: a bath swapped for a walk-in shower in a Bag Lane terrace, an ensuite carved out of a box room in the Gibfield semis, a boxed-in cylinder freeing up space. The rooms are tight, so the layout is worth getting right on paper before anything is ordered.

The bigger job is usually what the tiles are hiding. The town’s solid brick walls run damp and cold, and plenty of Atherton bathrooms have been tiled straight over a wet wall by the last fitter. We sort that at strip-out, tank or line the cold external walls, and plan the extraction so the mould the town’s bathrooms grow has somewhere to go.

Get a Free Quote 07812 075990

What We See on Atherton Bathrooms

  • Tiles lifting off damp solid walls in the older terraces
  • Small terrace bathrooms reworked for a walk-in shower
  • Ensuites carved out of box rooms in the semis
  • Mould over the shower where the extraction never coped
  • Cold external walls tanked or lined before tiling

An Atherton bathroom lasts when the wall behind the tiles is sorted first, which is the part a damp firm gets fussy about. We quote the whole room from a look round, in writing within 48 hours.

Where We Cover in Atherton

Atherton grew on coal and nail-making, and the housing shows its history street by street. There are long runs of late-Victorian and Edwardian red-brick terraces around Market Street, Bag Lane and Hindsford, the model colliery cottages Fletcher Burrows built at Howe Bridge, interwar and post-war council stock across Hag Fold, and the modern estates that have gone up at Gibfield on the old colliery land.

For our trades that mix sets the workload. The old terraces are solid brick with no cavity: original slate damp courses have cracked or been bridged, so rising damp and salty, blown plaster at low level are common. The council-built stock runs cold on its outside walls and grows condensation mould. The new builds mostly need finishing trades: skims, boarding and the odd fix where the first finish was rushed.

We work right across Atherton, including Hag Fold, Howe Bridge, Hindsford and Gibfield, and out into the surrounding towns.

Postcodes we cover: M46.

For the full rundown on how we do it, see our bathroom fitting & installation page, or everything we offer locally on our Atherton page.

Bathrooms Questions

The whole room. Rip-out, plumbing, electrics, damp and rot repairs, boarding, tanking, plastering, the suite and the tiling, coordinated as one job with one written quote. The plastering and damp side is where we start, because that is what most bathrooms need fixing in the first place.

It depends on the size of the room, the suite you choose and what the walls and floor are hiding, so we quote from a look round rather than a photo. The written quote breaks out the suite, the tiling and the building work so you can adjust the spec to suit the budget.

Yes, both run within the job. The plumbing and electrical work is carried out by qualified trades and certified as the regulations require, and any gas work is done by a Gas Safe registered engineer. Nothing gets tiled or boxed in until it has been signed off.

Want a Price in Atherton?

Tell us about the job and your postcode, and we’ll come and look, then a written quote, usually within 48 hours.

Get a Free Quote

Or message us on WhatsApp

Get your free quote

What needs doing?
Your details

Free written quote, usually within 48 hours. We never share your details.